Nhieu Loc Thi Nghe Wastewater Treatment Plant

The Nhieu Loc Thi Nghe Wastewater Treatment Plant is a major infrastructure project designed to handle a peak flow of 34,000 cubic meters per hour.

Key highlights:

  • Provide CONSTRUCTION DESIGN for all Disciplines (Architectural, Structural, MEPF, Infrastructure)
  • Collaboration & Integration with Process design on Revizto platform for seamless collaboration and integration of process design.
  • Clash detection to identify and resolve conflicts between different design elements early in the process. This helps in minimizing errors and ensuring a smooth construction phase.

This project is part of Ho Chi Minh City’s efforts to improve environmental sanitation and provide better wastewater management for its residents.

Scope of works:

Construction Design Development & 3D model integration

Client:  Acciona & Vinci Joint-Venture

Contact us

    *Required fields







      .doc|.docx|.pdf


      .doc|.docx|.pdf

      This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.